Parlin Shopping Center Project

The project of Parlin Shopping Center located in Marlik with 3000 square meters of Securit glass started in

The project of Parlin Shopping Center located in Marlik with 3000 square meters of Securit glass started in 2015.
All the work related to this project has been done by NeginJaam Company for about 6 months.

Project specifications of Parlin Shopping Center

Among the works done are printing (Samplus, Spandrel , Satina, Smoked Glass, Super Clear) along with 4 mouths of automatic door system with steel cover, steel railings related to stairs, aluminum structure and Securit glass. Did.
Another material used in this project is 26 service mouths with printed glass material.
The bathroom doors are mounted to the wall with a hinged hinge.
The glass used in this project is a 10 Mill Securit flute.
All the glass used in this project has been secured in the furnaces of the factory by Convevtion method and has been transferred to the project site with a special vault.

Other explanations

Among the notable points in this project, we can mention the movement of glass inside the project.
All the windows have been transferred to the floors with cranes and special caps.
The operator of the automatic doors used in this project is from the Italian brand Label.
The door operators in this project are covered with gold-plated steel covers that are placed on the profile as a special cover.
Steel 304 is used in the construction of stair railings.
In this regard, golden steel bases with a height of 110 cm on the stairs have also been used.
These metal bases along with Securite glass make the design beautiful and different.
The project of Parlin Shopping Center is one of the leading projects with first-class material, which is proud to be done by Negin Jam Complex.